Contact: ismail.nural@adesso.com.tr
Day-to-Day Track Maintenance Part II: Switches & Crossings (1952)
January 2, 1952Documentary0h 21m
Overview
Continuing the study of the normal tasks performed by a permanent-way gang, this film deals with the maintenance of switches, common crossings and obtuse crossings. These are the fundamental units from which all track layouts, however complicated are built up.
Videos
Similar Movies
Sky High: The Story Of TWAJanuary 1, 2001

All Aboard! New Zealand by Rail, Sea and LandJanuary 19, 2020

Train Entering Hove StationSeptember 22, 1897

Faces PlacesJune 28, 2017

hello, WORLD!April 1, 2021

Haramain: The Train of the DesertApril 6, 2021

Hitler's Steel BeastJanuary 20, 2017

Amtrak: The First 40 Years 1971-2011

The Cumbrian CoastDecember 1, 1997

S&M: Sweat and Muscle - The Dominatrix WorkoutJanuary 1, 1996

Line Dancing For SeniorsJanuary 1, 1992

De l'eau dans le gasoilJanuary 1, 2014

International Magic Presents The Derren Brown LectureApril 1, 1999

MikadoDecember 5, 2024

Inside Grand CentralMarch 7, 2006

The End Of The Line: Rochester's SubwayMay 1, 1995

Flåmsbana Minute By MinuteSeptember 5, 2010

Guy Martin: The British Train That Changed the WorldOctober 26, 2025

Mt. Washington Cog Railway: Climbing to the CloudsJanuary 1, 2015

OVERHEIGHT MUST TURNMay 25, 2018